General Category > New!
bundled proc. 11402
(1/1)
Nadine:
I am a novice biller and need help with bundled procedures. Our facility has their respective departments, HIM and BO. We always butt heads and I always fall back on my books or policies. HIM wants a provider to code an EM for S/R which I thought was bundled to the surgical procedure-11402. S/R was done at the 4th visit and is the 13th day from when procedure was done.
Need help! nadine
Michele:
If the EM was during the post op period and is for the same condition, then it is included with the surgery. I'm assuming S/R is suture removal, and that is included in the surgery reimbursement.
Nadine:
thank you, that is what i thought. i am so glad i found this site. you have been very helpful. plan to use this site more often. keep up the good work. nadine
Navigation
[0] Message Index
Go to full version