Medical Billing Forum
Billing => Billing => : dh1985 May 27, 2012, 11:41:01 PM
-
A holter monitor was placed on a patient on 5-1-12 through hospital outpatient department. My physician reads the holter monitor on 5-4-12. What date would I use to bill out for the PHYSICIAN READING of the holter monitor - 5-1-12 the date holter was placed or 5-4-12 the date the reading actually took place?
Thanks in advance for your help.
Denise
-
if billing for the reading, the date the reading was done, I believe. I would go with the 5/4/12.
-
Michele:
I have been using the date of the actual reading (ie 5-4-12) but I was second guessing myself.
Thanks for confirming for me.
-
You would use the date that the holter monitor was read. That way it is the same date as documented in the medical record.